one pcs in white or color box, several pcs in a carton,
Or according the customer's requirement.
Delivery Time
20--40 days after we received the deposit.
Product Description
Enamelled Non-stick Cast Iron Skillet, Grill Pans, Die-casting Frying Pan With Long Handle
Item Number
Size
HF70A
D:6.5''
HF71A
D:8''
HF71AS
D:9''
HF72A
D:10.5''
Surface Treatment
Pre-seasoned or Enamelled
6.5'' 8'' 10.5'' Cast Iron Frying Pan with bend handle Set
6.5'' 8'' 10.5'' Cast Iron Skillet with straight handle Set
9.5'' 10'' 12.5'' 13'' 15.5'' Cast Iron Fry Pan with double pouring spouts
Trade & Market
Product Process
Packing and Shipping
Packing and Payment information
Inner Box
White or Color Box
Barcode Sticker
Customized
Delivery Time
Within 40 Days
Payment Terms
T/T L/C
Certifications
Our Fry Pan, Skillet and Other Cast Iron Cookware have passed the LFGB, FDA, SGS certificate, so please rest assured purchase.
Showroom and Fair
Showroom Fair
Factory Information
Shijiazhuang Kingway Imp. & Exp. Co., Ltd
Our company is a largest factory of Cast Iron Cookware and Stoneware in north of China. We are in this fields for more than 10 years.
The products are well-sold in European, America and around the world.
Cast Iron Cookware
Main Product
Casseroles
Frying Pan
Pots
Skillet
Griddle
BBQ Grill Pan
Dutch Oven
Fondue Set
Potjie Pot
Sizzling Pan
Surface Treatment
Enamel Coating
Black Coating
Vegetable Oil ( Pre-seasoned)
Non-stick Coating
Antirust Oil
Wax Finished
Other Cast Iron Cookware
Casserole Rectangular Dish Sauce Pan Fondue Set
Fry Pan/Skillet Griddle Dutch Oven Potjie Pot
Contact us
1. How long has the company been established? Shijiazhuang Kingway Imp. & Exp. Co., Ltd was established in 2008. We have 8 years rich experience on exporting. 2. What is your main scope of business? We mainly manufacture and export cast iron cookware and stone cookware. 3. What is your sample policy? For new mold, we request 100% of the mold fee in advance, it will take about 20 days for opening. 4. How long does it take to receive goods? Sample: within 7-14 days Mass production: delivery time is about 40 days after receiving deposit and all design /confirm/ied 5. What are the payment terms? T/T 30% deposit and the balance against the copy of B/L or L/C at sight 6. Can we visit the factory? Yes, our factory is near our Capital---Beijing city, so it is very convenient for your visiting. You are welcome to visit our factory.